Air release manholes and valves are in place and construction of the holding pond at the Lindsborg Golf Course is complete. Testing of the line has been conducted and a few tests on the pumps remain. Once the tests are done reclaimed water can be pumped to the new holding pond.
March 3, 2011 |
March 3, 2011 |
A two inch line was laid around the plant and connected to hydrants; reclaimed effluent water is then pumped through the line for basin wash down and filling and can be used for lawn irrigation as well.
March 10, 2011